PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing duct work at the 2nd floor Facing East.jpg Continued installing sprinkler branches at the 1st floor Facing North.jpg Installed beams throughout Elev. 4 Facing South.jpg Installed sanitary piping at the 1st floor going intot the 2nd floor bathroom 253 Facing South.jpg Sprinkler branches at the 1st floor Facing North.jpg Started constructing the rack for the electrical equipment at the 2nd floor Facing East.jpg Started installing beams at Elev. 1,2,3 Facing West.jpg Started roughing bathroom 253 Facing South.jpg
Previous pageNext page Sprinkler branches at the 1st floor Facing North
Sprinkler branches at the 1st floor Facing North